Prefabricated Steel Building
Prefabricated steel building has features of high fire resistance, strong corrosion resistance. Prefabricated steel building is mainly refers to the main bearing component is composed of steel. Including the steel columns, steel beam, steel structure, steel roof truss.Each component using welds, bolts or rivets to connect.
The roof and wall can be made of sandwich panel or steel sheet. Galvanized metal sheet can prevent rust and corrosion. The use of self-tapping screw can make the connection between the plates more closely, to prevent leakage. You can also use composite panel for roof and wall. The sandwich is polystyrene, glass fiber, rock wool, polyurethane. They have good thermal insulation, heat insulation, fire-retardant. The wall of the steel structure maintenance also can use brick wall. The cost of a brick wall is higher than galvanized steel roof and wall.
Supply Ability
30000 Square Meter/Square Meters per Month Steel Structure Prefabricated steel Building.
Packaging & Delivery
Standard Sea Packaging
Port:Dalian/Tianjin
Lead Time:
Quantity(square meters) |
1 - 2000 |
2001 - 5000 |
5001 - 10000 |
>10000 |
Est. Time(days) |
30 |
35 |
40 |
To be negotiated |
http://www.sylibida.com/